E-Books Geology Project Topics and Material Project Topics and Material

Geology Project Topics and Material

Cost of Already-Made Project Material is N3,900 only. We deliver to your e-mail address within 10 – 30 minutes immediately after we confirm your paymentYou can send your proof of payment, department, project topic, the serial number of the project topic and your email address to 08024207231 / 08061379390 as text or whatsapp. Please scroll down to view the list of project topics.

NB: To write Fresh Project, Thesis, Seminar or Assignment for students, the table below shows the cost according to the level and type of research.

Level Academic Project / Thesis Seminar Assignment
Undergraduates N15, 000 and above N3, 000 and above N1, 000 and above
Post Graduates N20, 000 and Above N5, 000 and above N2, 000 and above

The table above shows the minimum cost for any Student’s Research Job. However, the exact cost of any of our research job is determined by the nature of the research, the type of data analysis required (if any) and the required research instrument. Please contact us (08061379390 or 08024207231) to confirm the exact cost of  your research.

These project topics below contain complete material with well written chapters 1 to 5, abstract and references for both Undergraduates, PGD, M.Sc and PhD Students in Nigeria and beyond.

  1. RESISTIVITY METHODS USED IN HORIZONTAL AND VERTICAL DISCONTINUITIES IN THE ELECTRICAL PROPERTIES OF THE GROUND WATER DETECTION
  2. THE SUBSURFACE MAPS AND THEIR APPLICATIONS IN THE OIL INDUSTRY
  3. GEOLOGY OF WESTERN AKING AND ITS ENVIRONS AND HEAVY METAL DISTRIBUTION IN SURFACE WATER STREAM SEDIMENT, AKING-WEST,SOUTHEASTERN NIGERIA
  4. HEAVY METAL DISTRIBUTION IN SEDIMENT OF AKPABUYO STREAM
  5. THE SUBSURFACE MAPS AND THEIR APPLICATIONS IN THE OIL INDUSTRY
  6. EFFECT OF POPULATION GROWTH ON LAND RESOURCES DEVELOPMENT A CASE STUDY IN ABA URBAN
  7. EFFECTS OF ELECTRONIC WASTE ON GROUND WATER
    8. ENVIRONMENTAL IMPACTS AND DANGERS OF POLYTHENE BAGS: A CASE STUDY OF JALINGO METROPOLIS
    9. NIGERIA’S IMMEDIATE NEIGHBOURS AND NIGERIA ARMED
    CIVIL CONFLICT OF 1967-1970
    10. NKARI AND HER NEIGHBOURS (1900-2000)
    11. ORIGIN OF THE GLOBAL INTEREST TOWARDS THE GULF OF GUINEA TO THE MILITARIZATION OF OIL IN NIGERIA
    12. ENVIRONMENTAL QUALITY STUDIES OF POTENTIAL EFFECT OF CRUDE OIL POLLUTION IN ANAKPA COMMUNITY IN URUAN, AKWA IBOM STATE, NIGERIA
    13. EVALUATION OF LIQUEFACTION POTENTIALS OF SOILS AT SOME SITE IN UYO METROPOLIS
    14. GEOTECHNICAL INVESTIGATION OF A BORROW PIT MATERIAL FOR THE CONSTRUCTION OF UYO-IKOT EKPENE HIGH WAY
    15. IMPLICATIONS OF THE INFORMAL SETTLEMENT IN DEVELOPMENT IN DEVELOPING CITIES
    16. RELATIONSHIP BETWEEN OIL EXPLORATION AND THE CHALLENGES OF IMPLEMENTING ENVIRONMENTAL PROTECTION POLICIES IN AKWA IBOM STATE

How To Make Payments On Analytics.NG and Get Complete Project Material(s) or Any Other Required Service(s)

Be rest assured dear researcher, that you are highly valued and therefore, your good grade is our concern and we are determined to help you achieve that. Our clients’ testimonial is a proof. For further inquiries, call 08061379390 or 08024207231.

PAYMENT OPTION: BANK DEPOSIT/TRANSFER PAYMENTS

All Cash, Direct Bank Deposits, ATM/Online/Bank Transfers and Cheque Payments should be made to:

Account Name: E-Franky Global Services Limited
Account Number: 0424528897
Bank: Guaranty Trust Bank (GTB)

Account Type: Current

INSTRUCTIONS AFTER PAYMENT

After payment, send the following details to 08061379390 / 08024207231 or click here to send us an email.
  •  Depositor’s name
  •  Transaction ID (for online payments)
  •  ATM location (for ATM transfers)
  •  Bank used in making the deposit
  •  Amount paid
  •  Project topic and code
  •  A functional e-mail address

Projects/Materials are sent in MS word format within 10-30 minutes of payment confirmation.

For questions and complaints, click here to contact us or call: 08061379390 / 08024207231.


PROMPT ON DELIVERY

We are a reputable online resource centre that is duly registered with the corporate affairs commission (CAC). We are God fearing and trustworthy on delivery of our services and therefore we would never scam you. By the grace of God, we have come this far through integrity and constant hard work. We always deliver the project materials within 30-60 minutes after your payment is confirmed by us.

Aside prompt delivery of the project materials, all project materials on this website are thoroughly researched by a host of our seasoned writers with lots of experience. You can be rest assured that our project materials represent good value for money and it’s really worth the try!!!
Analytics.NG
Franklin Chinonye, An Economist, Data Scientist, Astute Researcher and Management Consultant by profession, is the Executive Director of E-Franky Global Services Limited and Pioneer of Analytics.NG . . . [continue reading]
https://analytics.ng/profile

Leave a Reply

Your email address will not be published. Required fields are marked *